all thesesquestion must be answeredin the files I'vesent youplease and reference must be BCA and Australianstandard project 1 the question is talking about is the first set of files south morang files...

1 answer below »




















all thesesquestion must be answeredin the files I'vesent youplease and reference
must be BCA and Australianstandard



project 1 the question is talking about is the first set of files



south morang files is project two



toorak rd files is project 3



and its not report its only question and answer thanks but all your answersis through the files i will send to you



ill so send you a copy of the NCC volume when which you should reference















In relation to the Project 1 documentation that you have received
, determine the required FRL of the floor between the lower level and the upper level as per the deemed to satisfy requirements of the NCC 2019 (amd 1) BCA Volume One. (assume no concessions apply). Explain each step of your determination.



Research and recommend a material and method of construction (other than in-situ concrete construction) for the floor in order to achieve the required FRL level. Provide the reference material in your answer.













Write your answer here:



















1.4.1.
List all the structural design actions to be considered when designing the structure of the building to satisfy the performance requirements of the Section B of the NCC 2019 (Amd 1) BCA Volume One.
(For which project?)











Write your answer here:


















1.4.2. Referring to the recommendations of the geotechnical investigation report for Project 2, indicate the different footing types and the foundation material that each of the footing types need to be founded on.











Write your answer here:


















1.4.3. In relation to Project 2, the warehouses Blocks A & B there is a proposed Raking Angle RA1 which is secured to the external walls please indicate what this member RA1 is supporting. Give reference of the drawing number and detail number that you referred to for this answer.











Write your answer here:
































1.5.1. Referring to Project 2 structural drawings, determine the materials and the type of construction being proposed for the external walls of the warehouses. Which NCC Section C performance requirement is applicable to this type of external wall construction? Give the clause number and explain the applicability to Project 2.











Write your answer here:





















1.5.2. Assuming the Project 1 is in a cyclonic region, which part of the Section B of the NCC 2019 (amd 1) BCA Volume One would you refer to for the design of the structure of the building?











Write your answer here:












1.5.3. Assuming the Project 1 is in an earthquake prone area, which part of the Section B of the NCC 2019 (amd 1) BCA Volume One and which Australian standard would you refer to for the design of the structure of the building?











Write your answer here:
















1.6.1. Referring to the Project 3 Architectural drawings and provide a summary (in your own words) of the specification of the inter-tenancy wall type P1 (between 2 SOUs). What is the sound insulation requirement for this type of wall as per the BCA? Provide reference to the BCA clause.











Write your answer here:


















1.6.2. Refer to structural drawing S960 in Project 3 and indicate the method of the form of concrete construction used for floors and indicate the materials that make up this form of construction.











Write your answer here:














1.6.3. Refer to the following webpage and list 2 uses/ benefits of a raised access floor system. (link
https://www.tateinc.com/en-au/learning-center/benefits-of-underfloor-service-distribution-en)
(Is this question related to the project if it is for which one?)


Answered 2 days AfterMar 12, 2021

Answer To: all thesesquestion must be answeredin the files I'vesent youplease and reference must be BCA and...

Parul answered on Mar 14 2021
143 Votes
Ans1. Using materials and components essential for developing buildings and infrastructure that are resistant to fire. As per the BCA better known as Building Code of Australia, all levels are graded as per minutes of all three criteria like integrity, structural adequacy as well as insulation. I have performed extensive analysis of BCA as well as Australian standards with respect to various material and methods that can be leverage by construction for the floor such that one can attain the required FRL level. For instance, Hebel is one of the many fireproof structure materials prestigious for being non-burnable. It likewise meets the prerequisites for every one of the six Bushfire Attack Level classifications. In the event that you live in a bushfire inclined zone, this material is ideal for developing homes, matured consideration offices and schools. The Hebel PowerShield boards, regularly utilized in the Utilities and Infrastructure ventures, give fire and acoustic divider frameworks, intended to withstand warmth of up to 1300 degrees.
A method that is compliant with FRL is Logicwall. It is a perpetual method and well established AFS formwork framework for both inside and outer cement walling. This concrete is based on fibre framework is regularly used to develop multi-private and business structures and is dominated utilized in projects that require load-bearing dividers with undeniable degrees of fire and acoustic execution. Furthermore, this method has additionally gone through the CSIRO testing framework. A 120mm-thick divider, utilized for party dividers and outside facades was tried to have a Fire Resistance Level of 240/240/180.
Ans2. Below is the important parameters and list of all the action points of structural design that is required to considered while designing the structure of building that is required to satisfy the performance requirements
· Appropriate as well as standard performance that comprehend each and every reasonably probable action amongst the design
· Resisting and holding through all the frequently extreme as well as with consistent actions in design
Plans are expected to help the first person as well as people living in the close viciity from any constructional hurt, with the essential system overall abundance consistent and not being hurt to a degree unbalanced to the principal close by hurt. It is sought that plans won't to make hurt any Open association in same page various properties, by contradicting the exercises to which it may reasonably expect to be persecuted. Referring to the recommendations of the geotechnical investigation report for Project 2, indicate the different footing types and the foundation material that each of the footing types need to be founded on.
Ans3 Foundation can be categorised as deep and shallow deep foundations. These types of foundation work under both deep as well as foundation which is shallow for constructing the building and their applications. It is essential to understand the suitability of each type of foundation prior to its selection in any project of construction
Shallow Foundation -
· Isolated as well as Individual footing
· Strip foundation
· Footing which is combined
· Mat and Raft foundation
Deep Foundation
· Drilled shafts as well as caissons
· Foundation which is piled
Solitary equilibrium or an isolated equilibrium is the most generally perceived kind of foundation used for building improvement. This...