An engineer has compiled the data below for two different project options – one that includes a comprehensive pollution prevention program/option and one that does not (data are given in a table...


An engineer has compiled the data below for two different project options – one that includes a comprehensive pollution prevention program/option and one that does not (data are given in a table below). From an economic point of view, which project should the engineer select? The lifetime of the equipment is 10years and the interest rate is 10%.Pollution prevention cost data: