Evidence collection template – CPCCCM2009 Carry out basic demolition
Describe the activities which you undertook during your practical demolition task. As you complete this template, think about what you did, how you did it and why you did it. You should rely on the preparation and planning work that you did in the first task to help you. Make sure that your supervisor initials each section and, when you have completed all parts of the template, ask them to add their comments and endorse your work.
Part 1 – Inspecting the worksite
Describe the activities which you undertook to inspect the worksite in preparation for demolition.
Activity
Discussion
Suitable evidence
Supervisor’s initials
Assessing hazards and controlling risks
Describe the process that you undertook to assesses the worksite for hazards.
Completed work site inspection form
Photographs
Safety method statement
Demolition plan, specs, instructions
Relevant workplace policies and procedures
Asbestos management plan
Describe two hazards that you identified and the risk controls that you put in place.
Describe the process that you would undertake if, during your worksite inspection, you identified material that you suspected to be asbestos.
I have attached the following as evidence of this activity:
Existing services
Describe the process that you used to confirm that existing services have been disconnected.
Answer the following questions in your discussion.
»How did you identify the existing services?
»What services did you identify?
»Who did you speak to re confirming disconnections?
»How did you confirm that the services had been disconnected?
Documentation from regulatory authorities regarding disconnection
Identifying and reporting hazardous materials
Describe one hazardous material that you identified during the demolition.
Evidence of report
Related workplace policies and procedures
How did you report the hazardous material that you identified?
Describe how you complied with your workplace policies and procedures for hazardous materials.
Part 2 – Cleaning up
Describe the activities which you undertook to clean up the site after demolition.
Cleaning up
List six of the materials that you removed from the demolition site and note what you did with each one (for example, was it disposed of/stored/stacked for removal etc).
Material
Disposed of/stored/stacked
1.
2.
3.
4.
5.
6.
For each of the materials listed above, how did you decide what should be done with them?
Storing tools
Describe the process that you used to check and store four of the tools that you used during the demolition task.
Tool 1
Evidence of fault report
How did you check the tool?
What maintenance did you do to prepare the tool for storage?
How did you store the tool?
Did you find any faults with the tool?
Tool 2
Tool 3
Tool 4
Manual handling
Answer the following questions related to safe manual handling techniques.
Describe four factors that you must consider when stacking lengths of timber for storage on site.
Describe two safe manual handling techniques for shovelling
Describe two manual handling factors that you must consider when loading components onto a pallet for transport.
Supervisor comments and endorsement:
Supervisor signature:
Supervisor name:
Date:
Assessment outcome – CPCCCM2009 Carry out basic demolition: Evidence collection
¨ Satisfactory
¨ Not satisfactory
Assessor signature:
Assessor name: