For a software engineering project, given the estimated size2,000LOC, interpersonal coordination rate r = 20.0%, productivity ρ = 3.0kLOC/PY, and average salary CL= $80,000/PY, analyze and determine the expected cost of this project according to the FEMSEC model (Theorem 12.3 and Fig. 12.12).