Systems Analysis and Design Milestone I Grade Sheet Systems Analysis and Design Milestone 3 Grade Sheet (80 points) Project Title: Students: 1.0 Form and Report Designs 1.1 Specifications-deliverables...

I need a database built that has a person check of skills they have from a set amount. Then people are grouped based on the skills they have.


Systems Analysis and Design Milestone I Grade Sheet Systems Analysis and Design Milestone 3 Grade Sheet (80 points) Project Title: Students: 1.0 Form and Report Designs 1.1 Specifications-deliverables and outcomes 1.1.1 Narrative overview 1.1.2 Sample Design 1.1.3 Testing and usability assessment 1.2 Guidelines 1.2.1 Use meaningful titles 1.2.2 Include meaningful information 1.2.3 Balance the layout 1.2.4 Design an easy navigation system 1.2.5 Apply methods of highlighting 1.2.6 Follow guidelines for displaying texts 1.2.7 Follow guidelines for displaying tables and lists 2.0 Interface and Dialogue Designs 2.1 Specifications-deliverables and outcomes 2.1.1 Narrative overview 2.1.2 Sample Design 2.1.3 Testing and usability assessment 2.2 Guidelines 2.2.1 Structure data entry fields 2.2.2 Control data input 2.2.3 Provide feedback 2.2.3.1 Status information 2.2.3.2 Prompting cues 2.2.3.3 Error and warning messages 2.2.4 Provide help and online assistance 2.2.5 Design the dialogue sequence diagram 3.0 Documentations 4.1 User manual, user reference, and user training materials 4.2 System documents—source codes, technical report, maintenance manual, and testing data. 4.0 Corrections of Milestones 1 (5 points) & 2 (5 points) with a section cover page. 5.0 Complete MIS development project digital file (i.e., ONE Word report including Milestones 1, 2 & 3 and corrections of Milestone 1 and Milestone 2) submitted on time to the Blackboard 6.0 Complete MIS development project hardcopy (i.e., printout) submitted on time in class 7.0 Demo of a Working System (Application) 3.1 Data inputs (forms with guided instructions and error messages) 3.2 Processes (functions and programs) 3.3 Data outputs (reports, receipts, e-mail confirmation, etc.) [NOTE]: TII Score: %
Apr 27, 2021
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here