ICT For ConstructionScope of AssessmentThis assignment aims to explore the business case for the use/improved use ofLevel 2 BIM within a specific construction...













ICT For Construction



































Scope of Assessment


























This assignment aims to explore the business case for the use/improved use of










Level 2 BIM within a specific construction project/department/organisation










that you are familiar with. Each student is required to undertake an in‐depth investigation of relevant BIM technologies and their application in relation to the chosen context, presenting their findings in a Report and Poster. In completing the assignment, each student must clearly:
















1. Critically evaluate the current use of IT and/or BIM within the specific



















project/department/company/sector/profession.



















2. Identity and critically evaluate a range of technology‐enabled Level 2 BIM solutions, selecting the most appropriate solution(s), which can improve the current situation.



















3. Develop a business strategy for implementation/improved use of Level 2 BIM within the specific project/department/company/sector/profession.
















The proposed solution(s) must meet the defined requirements for Level 2 BIM, incorporate the













development of an appropriate Common Data Environment (adhered adhering to the requirements outlined in the relevant standards (e.g. ISO 19650).



















Assessment Submission & Criteria

























The







Report (worth 70%),







which should be framed as a business case for BIM or improved BIM (as appropriate), must be submitted via the link on Moodle no later than 10 pm on




5











th

















April 2022.































The main body of the report should be











1500 words








(not including the cover page, references etc.), with the word count clearly stated on the cover page. The Report should clearly address the three criteria outlined above and will be assessed on the following basis:











·


Critical evaluation of current IT/BIM 15 marks













·


Critical evaluation of a range of potential Level 2 BIM solutions 30 marks













·


Clear & practical implementation strategy 25 marks













·


Professionally presented report 20 marks













·


Quality of information used 10 marks



















Total













100 marks














The







Presentation (worth 30%)







must be produced in PowerPoint or a similar format







and







will take place during the timetabled







ICT for Construction







session on




6











th

















April 2023














.




















This presentation must be based on the work completed in the written report and include the













following:











·


Review of ICT/BIM/software 35 marks













·


Interaction/engagement with the class group 30 marks













·


Ability to present/explain in 8 minutes 35 marks



















Total 100 marks









Mar 02, 2023
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here