Speaker 1: (00:00) you, uh, submitted your second attempt, but it, I don't see any different between your second attempt and your first attempt. I compared the, um, uh, the documents and they're...

1 answer below »
Need to fix an existing assignment from a assignment 106150


Speaker 1: (00:00) you, uh, submitted your second attempt, but it, I don't see any different between your second attempt and your first attempt. I compared the, um, uh, the documents and they're virtually identical. So two things need to happen. Number one, go back to the instructions, um, for this assignment. And you'll see that, you know, it says to write an 875 word analysis of the supply chain operations. And you're gonna look at each one of these areas, uh, visual, you, you create a diagram, you talk about the supply chain, value chain, inputs, outputs, sourcing, risks, all of that. I would encourage you to make a subtitle that says each one of those things. You talk about each one of those things, you may have set mentioned some of these things in your current paper. So you may just have to move it around, but it's hard for me to tell whether or not this even met, because I have to look all over the paper to find what I need. So also, any changes that you make, any additions that you make, please make them in a, in a different color. Um, and, and that's, that's it right there. Um, uh, and I can't see your rubric when I do this right now, because the screen won't let me, but also look at the areas in the rubric and see if I put any notes in there for each one of those. So, um, there you go. If you have any questions, just let me know.
Answered 12 days AfterJun 16, 2022

Answer To: Speaker 1: (00:00) you, uh, submitted your second attempt, but it, I don't see any different between...

Dr Shweta answered on Jun 25 2022
94 Votes
PowerPoint Presentation
Project Description
The current project is related to the manufacturing of antibiotic drugs by a drug manufacturing company X.
The main problem of this project was that even aft
er utilization of the same raw material and power consumption the number of drugs produced were different.
Due to this lots of raw material and wastage was there.
To solve this problem of non uniform production and wastage of raw materials, project management strategies were used that were based on the Theory of Constraints and utilizes the six sigma method.
First of all the detailed analysis of production methodology was performed and for this the Critical Path Chart was design for the complete production days – beginning from day 1 to day 30 as shown
Preparation of list of all the necessary raw materials
Collection of all the necessary goods and inventories
Setting-up of machines
Assigning of work to different workers and employees
Distribution of inventories
Working protocols set and executed
Manufacturing begin
Inspections were conducted regularly to check the production process and whether all norms and guidelines are followed or not
Weekly meeting will be conducted to discuss the growth, issues if any and new suggestions for better yield
Proper storage of produced drugs
Marketed to different places, agencies and customers
Collection of customers reviews and feedbacks
Clinical trials
Meetings to discuss the overall market reports and feedbacks and make required changes if any.
Critical Path Chart
Finding , Planning and Controlling of the process
In finding section, we worked at three levels-
our research team did the thorough market analysis and checked the existing antibiotics, their market demands and the leading producers
Our research and development team and operational team did the in-depth investigations about the existing manufacturing strategies and the ways to improve the yield of the drug.
3. Our finance team checked all the financial transactions, the existing...
SOLUTION.PDF

Answer To This Question Is Available To Download

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here