OverviewFor this assignmnet students are expected to study the production and shipping costs of a potato manufacturer and formulate a Linear Programming model representing the problems, to implement...

1 answer below »
OverviewFor this assignmnet students are expected to study the production and shipping costs of a potato manufacturer and formulate a Linear Programming model representing the problems, to implement the model on a spreadsheet, to optimise the solution and to write a report discussing the recommendations to the problem.Students are required to complete two components: A Word file, for the report containing the details of the model (including writing the objective function), the solution and the recommendations to the problem. And an Excel file for the model using Solver.The problem is documented in the attached screen capture.
Answered Same DayNov 02, 2019OMGT2287

Answer To: OverviewFor this assignmnet students are expected to study the production and shipping costs of a...

David answered on Nov 30 2019
128 Votes
Report-1
    Route trsucture, flows and rote capacity constraints
    Label    Ship    To    Cost    Flow        Route capacity
    X12    1    2    6    0    <=    200                Node balance constraints
    X13    1    3    4    0    <=    200                Plant Constraints
    X14    1    4    6    0    <=    200                Node    Net Outflow        Capacity
    X15    1    5    6    0    <=    200        
        1    0    ≤    150
    X16    1    6    21    0    <=    200                2    -400    ≤    250
    X17    1    7    21    0    <=    200                3    -320    ≤    350
    X21    2    1    10    0    <=    200
    X23    2    3    10    0    <=    200                Warehuse constraints            Keeps nothing
    X24    2    4    2    200    <=    200                Node    Net Outflow
    X25    2    5    2    0    <=    200                4    0    ≤    0
    X26    2    6    9    200    <=    200                5    0    ≤    0
    X27    2    7    16    0    <=    200                Customer constraints            Demand
    X31    3    1    1.4    0    <=    200                Node    Net Inflow
    X32    3    2    9    0    <=    200                6    500    =    500
    X34    3    4    2    0    <=    200                7    220    =    220
    X35    3    5    1.5    200    <=    200
    X36    3    6    11    100    <=    200
    X37    3    7    13    20    <=    200
    X45    4    5    2.2    0    <=    200
    X46    4    6    3    200    <=    200
    X47    4    7    13    0    <=    200                    node    In-out
    X54    5    4    1.8    0    <=    200                    1    0    64
    X56    5    6    3    200    <=    200                    2    -400    49
    X57    5    7    13    0    <=    200                    3    -320    37.9
    X67    6    7    2    200    <=    200                    4    0    18.2
    X76    7    6    8    0    <=    200                    5    0    17.8
    Objective Minimize cost            64                                6    500    2
    Total    5460                                        7    220    8
Answer Report 1
    Microsoft Excel 15.0 Answer Report
    Worksheet: [Assignmnet 2.xlsx]test
    Report Created: 11/10/2017 11:43:26 AM
    Result: Solver found a solution. All Constraints and optimality conditions are satisfied.
    Solver Engine
        Engine: Simplex LP
        Solution Time: 0.203 Seconds.
        Iterations: 25 Subproblems: 0
    Solver Options
        Max Time Unlimited, Iterations Unlimited, Precision 0.000001
        Max Subproblems Unlimited, Max Integer Sols Unlimited, Integer Tolerance 1%, Assume NonNegative
    Objective Cell (Min)
        Cell    Name    Original Value    Final Value
        $B$30    Total Ship    7260    7260
    Variable Cells
        Cell    Name    Original Value    Final Value    Integer
        Flow
        $E$3    X12 Flow    50    50    Contin
        $E$4    X13 Flow    0    0    Contin
        $E$5    X14 Flow    0    0    Contin
        $E$6    X15 Flow    0    0    Contin
        $E$7    X16 Flow    0    0    Contin
        $E$8    X17 Flow    0    0    Contin
        $E$9    X21 Flow    0    0    Contin
        $E$10    X23 Flow    0    0    Contin
        $E$11    X24 Flow    0    0    Contin
        $E$12    X25 Flow    200    200    Contin
        $E$13    X26 Flow    100    100    Contin
        $E$14    X27 Flow    0    0    Contin
        $E$15    X31 Flow    0    0    Contin
        $E$16    X32 Flow    0    0    Contin
        $E$17    X34 Flow    0    0    Contin
        $E$18    X35 Flow    0    0    Contin
        $E$19    X36 Flow    200    200    Contin
        $E$20    X37 Flow    200    200    Contin
        $E$21    X45 Flow    0    0    Contin
        $E$22    X46 Flow    0    0    Contin
        $E$23    X47 Flow    0    0    Contin
        $E$24    X54 Flow    0    0    Contin
        $E$25    X56 Flow    200    200    Contin
        $E$26    X57 Flow    20    20    Contin
        $E$27    X67 Flow    0    0    Contin
        $E$28    X76 Flow    0    0    Contin
    Constraints
        Cell    Name    Cell Value    Formula    Status    Slack
        $L$12    <= Net Outflow    0    $L$12<=$N$12    Binding    0
        $L$13    <= Net...