Part B - You will use the given case study to complete this part individually or in a group of 2-3 students. You will begin developing the cost management planning components of your Cost Management...

Part B - You will use the given case study to complete this part individually or in a group of 2-3 students. You will begin developing the cost management planning components of your Cost Management Plan in Module 4. For this plan, you are responsible for developing the project cost estimate and a project budget baseline. In addition to your cost estimates and budget, include a 750 words to describe the processes, and tools and techniques you are using in your cost management plan, as well as justification of your budgetary plan. You can use the templates found in this module’s Learning Resources or a format of your own. In Module 5, you will develop the quality management planning components of your Quality Management Plan. Refer to the learning resources and the template provided for guidance. The written portion of your quality management plan should consist of 750 words.


PROJ6002- -Trimester 2 2020 1 Vehicle Maintenance Facility Case Study Vehicle Maintenance Facility project is a hypothetical corporate vehicle maintenance facility, and is designed to contain features that are typical in small‐scale commercial buildings. The contract itself is assumed to be a fixed‐price, fixed‐scope arrangement between an owner and a general contractor. All code and zoning approvals have been obtained, and construction can begin immediately upon receipt of the notice to proceed. The site is located on a city street in an industrial park. The existing slope of the site is minimal, and bringing the site to finish grade does not require large amounts of excavation. The site plan contains a large parking lot to allow for vehicle parking and movement during servicing. The paving is asphalt over graded aggregate base with concrete curb and gutter, and runoff is handled by catch basins and 18‐inch corrugated metal pipe storm drains. The building itself contains two main areas, which are a high bay space for actual vehicle servicing, and an attached office and training area. The structure of both spaces consists of CMU walls with steel joist roof structures, with concrete floors. The vehicle servicing area is designed for handling pickup trucks and light vans. It has four service bays with roll‐up doors at both ends, and a service pit under two of the bays which allows easier access to the underside of vehicles. Also, the servicing area contains vehicle lifts, oil and lube, coolant and air conditioning service equipment, as well electrical and pneumatic power outlets. Heating of this space is done with suspended gas‐fired heating units. Compressed air is provided by an air compressor located in an adjacent room. The office and training area is finished space, with steel studs and gypsum wall partitions, suspended ceilings, and varied floor finishes. In addition to finished office and classroom space, this area contains restrooms, a locker room, and an employee break room. All doors are hollow metal with standard commercial hardware, with the exception of the front entrance, which is commercial storefront. The heating and cooling of the office areas is done using two systems, each consisting of exterior condenser unit, plus air handling units in a dedicated room, and ductwork mounted above the suspended ceiling. In addition to standard power and lighting, the building has modern voice and data systems, as well as a wired fire alarm system. PROJ6002- -Trimester 2 2020 2 As the new project manager, you are pondering what to do next. After discussion with your project administrator you realise that you need to do some work in relation to the Project Management Plan that you are busy developing. Your project administrator emails you the following dependency table (Table 1) as well as cost of activities (Table 2) and the available human resources for the project (Table 3) that should be considered to get your tasks done. PROJ6002- -Trimester 2 2020 3 Table 1- Vehicle Maintenance Facility- Project Dependency Table ID Name Duration Predecessors 1 Project Management 2 Receive NTP 0 days 3 Mobilize General Conditions items 5 days 2(FS) 4 Bonds and Permits 2 days 2(FS) 5 Initial Site Work 6 Clear & grub site 3 days 3(FF+2),4(FS) 7 Rough grade site 5 days 6(FS) 8 Install storm drains 18 days 7(FS) 9 Foundation 10 Excavate 3 days 8(FS) 11 Backfill around foundation 2 days 10(SS+9) 12 Install steel columns 1 day 11(FS) 13 Prep and place SOG 3 days 12(FS) 14 Install work platform 1 day 13(FF-2) 15 Install access stair 1 day 14(FS) 16 Install WF support beams 2 days 15(FS) 17 Lay corrugated steel decking 2 days 16(FS) 18 Prep and place concrete topping 3 days 17(FS) 19 Complete Foundation 0 days 18(FS),17(FS+2),15(FS) 20 Structure 21 Erect roll‐up door frames 4 days 19(FS+3) 22 Erect 8” CMU walls 9 days 21(SS+10) 23 Erect brick Veneer 6 days 22(SS+10) 24 Install exterior windows 2 days 23(FS) 25 Install storefront at main entrance 5 days 23(FS) 26 Erect structural steel 5 days 23(FS), 25(FF+1) 27 Lay corrugated steel roof decking 2 days 26(FS) 28 Lay rigid roof insulation 2 days 27(FS) 29 Install cold process roofing and flashing 5 days 28(FS) 30 Install precast concrete coping at parapets 4 days 29(FS) PROJ6002- -Trimester 2 2020 4 Table 1- Vehicle Maintenance Facility- Project Dependency Table (continued) ID Name Duration Predecessors 31 Interiors 32 Hang ductwork and install AHUs 14 days 30(FS) 33 Erect HM door frames 3 days 32(SS+12) 34 Erect steel studs 5 days 33(FS) 35 Rough in panels, conduit and wiring 8 days 34(FS) 36 Rough in Plumbing 5 days 34(FS) 37 Rough in HVAC control system 5 days 34(FS+2) 38 Rough in fire alarm system 5 days 34(FS) 39 Rough in voice/data system 3 days 34(FF+4) 40 Rough paint 4 days 38(FS+2), 39(FS) 41 Hang ceiling grid 7 days 40(FS) 42 Install lighting fixtures in ceiling grid 13 days 40(FS) 43 Install registers and grilles in ceiling grid 5 days 40(FS) 44 Install ceiling tiles in grid 3 days 42(FF+2),43(FS) 45 Lay ceramic tile in restrooms 5 days 44(FS) 46 Install plumbing fixtures in restrooms 3 days 45(FF+3) 47 Install toilet partitions in restrooms 3 days 46(FS) 48 Install toilet accessories in restrooms 2 days 47(FS) 49 Install wash basin in locker room 2 days 45(FS) 50 Install lockers and benches in locker room 3 days 48(FS) 51 Install casework in break room 2 days 44(SS+4) 52 Install appliances in break room 2 days 51(FS) 53 Install carpet and base 3 days 52(FS) 54 Hang doors and hardware 5 days 53(FF-1),52(FS) 55 Finish mechanical 3 days 49(FS+1) 56 Finish electrical 2 days 55(SS-2) 57 Install projectors in meeting and training rooms 2 days 56(FS) PROJ6002- -Trimester 2 2020 5 Table 1- Vehicle Maintenance Facility- Project Dependency Table (continued) ID Name Duration Predecessors 58 Hang screens and whiteboards in meeting and training rooms 2 days 56(FS) 59 Complete interior buildout 0 days 58(FS),52(FS+2),53(FS-1) 60 Final Site Work 61 Install gate – dumpster enclosure 2 days 59(FS+2) 62 Install bollards at roll‐up doors 4 days 61(FS) 63 Fine grade for parking lot 3 days 62(SF+5) 64 Place curb and gutter – parking lot 13 days 63(FS) 65 Stripe parking lot and install signage 5 days 64(SS+4) 66 Install sidewalks at building entrance 3 days 65(FS) 67 Landscaping 5 days 65(FS) 68 Erect main entrance sign 5 days 66(FS) 69 Complete Final Site Work 0 days 65(FS),67(FS) 70 Project Closeout 71 Final cleanup 5 days 69(FS) 72 Final inspection 2 days 71(FS),65(SS+3) 73 Punchlist work 5 days 72(FS) 74 Substantial Completion 0 days 73(FS) 75 Obtain Certificate of Occupancy 5 days 74(FS) 76 Project Completion 0 days 75(FS) PROJ6002- -Trimester 2 2020 6 Table 2- Vehicle Maintenance Facility- Activity Cost ID Name Cost 1 Project Management 2 Receive NTP 3 Mobilize General Conditions items $ 17,300 4 Bonds and Permits $ 24,500 5 Initial Site Work 6 Clear & grub site $ 12,500 7 Rough grade site $ 8,840 8 Install storm drains $ 24,552 9 Foundation 10 Excavate for Service Pit $ 1,573 11 Backfill around Service Pit $ 1,206 12 Install steel columns in Service Pit $ 3,989 13 Prep and place SOG in Service Pit $ 2,440 14 Install work platform in Service Pit $ 2,440 15 Install access stair in Service Pit $ 6,675 16 Install WF support beams in Service Pit $ 18,750 17 Lay corrugated steel decking over Service Pit $ 6,369 18 Prep and place concrete topping over Service Pit $ 8,573 19 Complete Foundation $ ‐ 20 Structure and Envelope 21 Erect roll‐up door frames $ 4,000 22 Erect 8” CMU walls – Office Area $ 17,864 23 Erect brick Veneer – Office Area $ 19,693 24 Install exterior windows – Office Area $ 5,940 25 Install storefront at main entrance – Office Area $ 1,564 26 Erect structural steel and joists – All areas $ 41,893 27 Lay corrugated steel roof decking – All areas $ 28,107 28 Lay rigid roof insulation – All areas $ 11,451 29 Install cold process roofing and flashing – All areas $ 11,520 30 Install precast concrete coping at parapets – All areas $ 18,160 PROJ6002- -Trimester 2 2020 7 Table 2- Vehicle Maintenance Facility- Activity Cost (continued) ID Name Cost 31 Interiors – Office Area 32 Hang ductwork and install AHUs – Office Area $ 47,750 33 Erect HM door frames – Office Area $ 3,150 34 Erect steel studs – Office Area $ 6,819 35 Rough in panels, conduit, and wiring ‐ Office Area $ 26,060 36 Rough in Plumbing ‐ Office Area $ 4,500 37 Rough in HVAC control system ‐ Office Area $ 4,250 38 Rough in fire alarm system ‐ All Areas $ 17,374 39 Rough in voice/data system ‐ Office Area $ 18,821 40 Rough paint $ 4,200 41 Hang ceiling grid $ 7,988 42 Install lighting fixtures in ceiling grid – Office Area $ 11,156 43 Install registers and grilles in ceiling grid – Office Area $ 4,250 44 Install ceiling tiles in grid $ 8,516 45 Lay ceramic tile in restrooms $ 6,591 46 Install plumbing fixtures in restrooms – Office Area $ 14,800 47 Install toilet partitions in restrooms $ 4,920 48 Install toilet accessories in restrooms $ 2,239 49 Install wash basin in locker room ‐ Office Area $ 2,500 50 Install lockers and benches in locker room
Aug 16, 2021
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers