Please read documents attached for instructions and guide to complete assignment.

Assignment 2 notes:


Q2 - use the separate PDF file below and not the lower level quality copy in the assignment.


Q1bi - Typo.: 10140 point should be chainage 440m to match part ii. Has no impact on any answers or the question.




Microsoft Word - Assignments 2020 SVY2303.docx SVY2303 Introductory book Page 1 SVY2303 Construction surveying SVY2303 Introductory book Page 2 Course assessment Assignment extension policy The penalty for late submissions of assignment work is documented in the USQ Assessment Procedure link below, in practice penalty will be applied at up to 10% per day late to a maximum of 2 weeks. This penalty may be waived in part or in total where: ● failure to meet the due date for submission of assignment work was due to ill-health or other reasons beyond your control, such as excessive or exceptional work commitments and can be substantiated by documentary evidence such as a medical certificate or a signed statement from your employer. ● assignment extension applications must be lodged prior to the due date of the assessment ● Students should refer to the USQ Assessment Procedure: http://policy.usq.edu.au/documents.php?id=14749PL (point 4.2.4) Objectives assessed in this course Module Objectives 1 2 3 4 5 6 7 8 9 10 11 Assignment #1     Assignment #2     Assignment #3         Course Objectives 1 2 3 4 Assignment #1    Assignment #2    Assignment #3    Past examination Past examinations for this course can be found on the Studydesk. SVY2303 Introductory book Page 3 Assignment 1 Due date: 24 August 2020 Value: This assessment carries 200 of the 1000 total marks for this course (20% of total weighting) Question 1 (60 marks) a. Activity Duration Precedents A-Start 0 B 3 A C 3 A D 2 A E 4 BC F 8 D G 9 F H 2 EG I 3 G J 6 F K 3 J L 4 I M 3 KL N 1 M O 4 K P-End 0 HNO Draw a Gantt Bar chart representing the above events, depicting: activity and duration, total float, critical path and duration. (20 marks) b. List the most appropriate type of contract and discuss the reasons for your conclusion for the following tenders: (i) The supply of three (3) robotic total stations plus specified associated equipment; (ii) The supply and delivery of cadastral survey pegs and stakes to a large residential subdivision at a specified location - approximately 2000 to 3000 units for each item. ((i,ii) List 8 marks, Discussion 12 marks) Marking scheme for 1(a): Activities/duration Chart 50%, Float 25%, Critical path/duration 25%. Marking scheme for 1(b): List 25%, Explanation 75% SVY2303 Introductory book Page 4 Question 2 (70 marks) a. The following natural surface levels were taken along the proposed centre line of a road: Chainage/meterage RL 600 620 640 660 680 700 720 740 760 780 800 30 30.5 31 31 32 33 33 32.5 32.2 32 31 An equal tangent parabolic vertical summit curve is to be placed between two successive design formation grades of +3.0% and -2.0% which meet at a point 700m at a reduced level of 33.2 m. The length of the curve is 200 m. Compute and tabulate: i. the calculated RL’s of the chainages/meterage along the tangents; (5 marks) ii. the reduced levels of the design surface; (10 marks) iii. the cut(-ve) or fill(+ve) required at each peg at the centre line. (5 marks) b. The centre-line of two railway culverts is required to be set-out from the start of a transition curve, curving to the right. Calculate the deflection angle and chord from the start of the transition curve using the rigorous ideal transition curve formulae, using the following data: Intersection angle = 20o19'50" Radius = 350m Transition length = 50 m Start point (TS) of transitioned curve = 565 m (i) Chainage/meterage of culvert one = 610 m (ii) Chainage/meterage of culvert two = 680 m (i 10 marks, ii 20 marks) c. A surveyor when placing a fill situation catch point mark for batter marking, measures the modelled catch point by the following data and given information: Height of collimation of level = 87.0 m Design centre-line level = 86.15 m SVY2303 Introductory book Page 5 Distance from the design centre-line to edge of shoulder = 5.0 m Pavement crossfall from the design centre-line = -3% Shoulder batter (-ve for fill situation) = -1: 0.5 (horizontal to vertical) or -2: 1 Natural surface staff reading for catch point = 2.43m, taken at the 8m modelled offset from the centre-line as read off the construction tables. Calculate if the catch point is in the correct modelled position, and if not, what would be a suggested shift, assuming the ground is level, apply a check to your solution. (20 marks) Question 2 marking schemes: Calculations: 75%, Check: 25%, fully document your answers. Question 3 (70 marks) a. Robert from River Adventures runs a white-water rafting company and tells you that the Clearwater River varies in height over the season by about 5 metres and this affects the raft speed. Based on the information below. (30 marks) Roughness coefficient = 0.025 Hydraulic gradient = 0.016m/m Acceleration due to gravity = 9.8m/s2 Calculate the (i) hydraulic radius and velocity of flow by Manning’s Formula and (ii) rate of flow per hour for both the high water and low water marks. (i 5 marks, ii 10 marks, for each water mark) 6m SVY2303 Introductory book Page 6 b. The top of a pile requires final placement at E 100.8, N 200.6 and RL 50m (say for bridge/wharf/jetty construction). The pile is angled away from the centre-line along the line of the piles, into the sub-surface at a +10 angle off normal. The bridge centre-line has a bearing of 20 and the required line of piles to the left of the centre-line has a bearing of 290. A measurement to the current position of the pile top has been reduced to be at E 101.5, N 200.1 and RL 55.9m. Calculate the required movement of the pile top, so as to be positioned to commence driving at RL 55.9m, along the line of skew. See plan and elevation views below. (30 marks) c. A flight of levels is run from a Bench Mark of R.L. as per the table below and the following readings obtained: (Booked down the page) B/S I/S F/S RL HI (coll.) Comment 1.34 1.65 1.11 0.86 0.496 0.985 1.978 1.121 1.230 86.40 BM1 CP1 CP2 CP3 CP4 At CP4 position of the level, six height pegs at 20 metre intervals (100m in total) are to be set out at a falling grade of 1 in 420. The first peg (i.e. 00) has a design level of 86.20m. Calculate the grade levels and staff readings required for the top of each peg using the Height of collimation booking method and enter the results in level book form. (10 marks) Question 3 marking schemes: Calculations 100%, fully document your answers. 20 ° c/ l 290° line of piles and measured position RL 50m ce nt re li ne
Answered Same DayAug 17, 2021University of Queensland

Answer To: Microsoft Word - Assignments 2020 SVY2303.docx SVY XXXXXXXXXXIntroductory book Page 1 SVY2303...

Ishwar answered on Oct 03 2021
145 Votes
Construction surveying
Student Name
University
Answer: 1
a.
Given Data
Starting point tangent (TS) = 26480 m
Angle = = 5.275
Distance = 99.83 m
Horizontal circular curve, R = 800 m
Tangent length (T) =
Cur
ve length (l) =
(L) =
E =
Mid-ordinate
Long tangent distance
Chainage of
Chainage of Secant = 23.69 + 147.30
= 170.99
Chainage of ST = 170.99 + 147.30
= 318.29
b)
Offset;
Answer b. 1
Answer b. 2
Assuming the instrument has curvature and refraction applied and vertical index error correction turned on, the HI (coll.) = 101.1m
RL440 = 101.1- 0.983 -1.525 = 98.592
RL498 = 101.1-0.086-1.525 = 99.489
Layer thickness 440 = 101.1-98.592 = 2.508
Layer thickness 498 = 101.1-99.489 = 1.611
Answer c.
Depth = 4m
Length = 35 m
W = 19 m
Constraints, dam tank can hold volume greater than 4000
The storage capacity obtains as following;
V = 19 x 35 x 4 = 2660
From the mathematical fundamental equations and applied trail & error method,
Increasing total length by 4 m, the following solution obtained and increasing width by 7 m
V = 39 x 26 x 4 = 4056
Answer: 2
Design of sewage system and important criteria needs to consideration:
As provides in above sewage design, the following are important criteria needs to consider while designing sewage system.
a. Initially, find out the contour survey of the specific area needs to serve sewage and drainage design. This includes street layout, specific location allotments and buildings. It is also needs to consider the altitude with respect to sea level, flood condition, level and specific sites for the pumping stations.
b. By considering trials series, it is require to elect the location of the outlet which can able to drain out from the specific area. The drainage plan is most economical and suitable for the truck. In this case, the branch lines and laterals falling by considering general terrain which are added to the system. The branch lines are laterals falling with the general terrain which is essential to add to the system. The branch lines are generally place along the rear common boundaries between the allotments or in the street areas. In this case, the economical layout can reduce the total cost...