The annual load duration curve of a certain power station is a straight line from 20 to 7 MW. To meet this load, three turbine-generator units, two rated, at 12 MW each, and one rated at 8 MW are installed. Calculate the following: (i) Installed capacity, (ii) Plant factor, (iii) Units generated per annum, and (iv) Utilization factor.