You can use ‘Building G’ progressive CostX file or import ‘Building G Part B’ CostX file to start with Part C. 1. 2. • • • Rectify if there are any progressive errors such as building details, drawing...




  1. You can use ‘Building G’ progressive CostX file or import ‘Building G Part B’ CostX file to start with Part C.




1. 2.


• • •


Rectify if there are any progressive errors such as building details, drawing details and calibration issues based on the feedback received on Part B, before starting Part C.


Prepare the Taking off check list, Measure, and Bill ONLY the following items. Bill under appropriate sections and write descriptions following ASMM and specifications notes.


Windows and internal door including associated items (frames, architraves and paint), only for the Bedroom 1. Hardware to windows and internal door, only for the Bedroom 1.


All finishes to Bedroom 1 (wall finishes, ceiling finishes, floor finishes, skirtings and paining to all required items including doors and windows). Measure both sides of the internal door.


Page 3 of 4


3.


Edit the CostX file as follows:




  1. By using the "Reference" function check that all dimension groups that you have measured have been included


    in the Workbook.




  2. Cross check all items required to be measured and billed in Parts A to B are included correctly in the Workbook




  3. Delete all unused / unneeded dimension groups (if any) from the "Dimension View."




  4. Do a final check and edit of the Workbook (BQ) including formatting with identical fonts and font sizes. This final


    edit is to achieve a complete and professional document covering only the items that you have been required to measure and bill as described in Parts A to C. This edit must include editing, if required, the ‘Quantity Sheet’ as well as the main page of the Workbook that a Client would see.




Export the Cost X file and name it ‘Building G Part C_SURNAME’ and submit.
Word document as Appendix - You will also need to submit a Word document as Appendix including followings;




  • − Taking off check list




  • − Any manual calculations and/or assumptions (if any)




  • − A list of modifications or improvements you learnt through the measurement and billing process from Part