11. A 950-MW thermal power plant operates 6 hours a day during the peak demand hours. Assuming its overall etticiency is 55 % , calculate (a) the input energy required per day in MJ. (Answer: 10.36...





11. A 950-MW thermal power plant operates 6 hours a day during the peak demand hours. Assuming its overall etticiency is 55 % , calculate (a) the input energy required per day in MJ. (Answer: 10.36 GWh or 37.29 x 10 M) (b) the amount of natural gas in cubic meters it consumes per day. (Energy content of natural gas is 37.3 MJ per m3) (Answer: 1 x 10 cubic meters)