Critical pathii. Node numbersiii. Durationsiv. Earliest / Latest start and finish for eachactivityv. Float for each activityvi. Major milestones***vii. Total time to complete this delivery order



Critical path






ii. Node numbers






iii. Durations






iv. Earliest / Latest start and finish for each
activity







v. Float for each activity






vi. Major milestones***






vii. Total time to complete this delivery order



Agile Solutions 123 Satellite Way Baltimore, MD 12345 E-Mail: [email protected] Web: http://agile solutions.com 26 September 2022 Mrs. Erin Hein Project Manager SPAWAR 123 UAV Lane Charleston, SC 54321 Dear Mrs. Erin Hein: Please review the individual homework four below on CPM Network, and don’t hesitate to reach out to me if you have additional questions or concerns related to a submitted homework assignment. Sincerely, Sumaid Mahmood (Team 03) Agile Solutions Project Manager Use the provided CPM Network** to complete the following: i. Critical path ii. Node numbers iii. Durations iv. Earliest / Latest start and finish for each activity v. Float for each activity vi. Major milestones*** vii. Total time to complete this delivery order 36 Task Listed: 1. Perform independent research on each of the five candidate IR sensors (5 days each for the Red-Eye series, two weeks each for the others). 2. Perform a trade study to down-select to two IR sensor candidates (1.5 weeks). 3. Develop performance models for both IR sensor candidate sensors (6 weeks each). Note: These should be done separately but can be accomplished in parallel. 4. Develop a CONOPS to determine how IR / optical sensors are to be used on the X-65B (8 weeks). 5. Use the CONOPS and IR sensor performance models to develop / run independent performance simulations (4 weeks each). Note: These should be done separately but can be accomplished in parallel. 6. Use the outcome of your simulations as an input for a technical review to down select to a single IR sensor (preparations – 2 weeks). 7. Hold the IR sensor review and down select to a single IR sensor (1 day) 8. Perform research on the Eagle-Eye 2000® optical sensor (4 weeks). 9. Develop a performance model for the Eagle-Eye 2000® (2 weeks). 10. Update the performance model for the Tiger-Eye 1000® optical sensor (1 day). 11. Use the CONOPS and performance models to develop / run independent performance simulations (Tiger-Eye 1000® - 2 weeks, Eagle-Eye 2000® - 5 weeks) 12. Use the outcome of your simulations as an input for a technical review to down select to a single optical sensor (preparations – 2 weeks). 13. Hold the optical sensor review and down select to a single optical sensor (1 day). Please note that the IR sensor review and optical sensor review must be held separately, but can occur in parallel. 14. Design a common prototype hardware integration package to allow the selected IR / optical sensor to be mounted in the X-65B. This mounting package must be designed in such a way to mount either the selected IR or optical sensor (dual-use) (10 weeks). Note: This includes the development of a prototype to be used for hardware integration package testing (item15). 15. Test the hardware integration package and make required modifications (2 weeks). 16. Build three hardware integration packages (2 weeks total). 17. Design software to integrate the selected IR sensor with the X-65B mission computer (12 weeks). 18. Code IR sensor integration software (4 weeks). 19. Perform IR sensor software integration testing with the IR sensor and the X- 65B simulator (3 weeks). 20. Design software to integrate the selected optical sensor with the X-65B mission computer (13 weeks). 21. Code optical sensor integration software (2 weeks). 22. Perform optical sensor software integration testing with the optical sensor and the X-65B simulator (3 weeks). 23. Install IR and optical sensors on the X-65B (2 days each – this can be done simultaneously, if required). 24. Perform final IR payload integration testing with the X-65B aircraft and make required changes (2 weeks). 25. Perform final optical payload integration testing with the X-65B aircraft and make required changes (2 weeks). 26. Develop test plan for X-65B live sensor testing (sensor independent – not dependent on selected sensors) (12 weeks). 27. Using the test plan, perform required hazard / safety analysis (3 weeks). 28. After completing the hazard / safety analysis, attain live sensor testing approval (6 weeks). 29. Perform X-65B live sensor tests (both sensors simultaneously) (2 weeks). 30. Develop live demonstration* plan, based on the outcome of the X-65B live sensor tests (1 week). 31. Make final changes to sensor payload configurations, based on live sensor tests (2 weeks). 32. Hold live demonstration* review (everything must be ready before this review occurs) (2 days). 33. Perform a practice series of dry run demos in preparation for the formal demonstration* (1 week). 34. *Perform live sensor demonstration (1 day). 35. Perform “hot wash” meeting after demonstration (1 day). 36. Write final close-out report, based on “hot wash” meeting (1 week). * These activities are all referring to the same demonstration 2 Slide 1 4 3 2 Develop test plan for X-65B live sensor testing (26) Perform hazard/safety Analysis (27) Research Red-Eye 1000 (1) Research Red-Eye 2000 (1) Research Heat Finder (1) Research Heat Imager II (1) Research IR Sense IT (1) Dummy Activity Dummy Activity Dummy Activity Dummy Activity Develop CONOPS (4) TE 1000 Update (10) EE 2000 Research (8) Develop EE 2000 model (9) Develop IR #1 Model (3) Develop IR #2 Model (3) Dummy Activity TE 1000 Sim (11) IR Sensor Trade Study (2) Dummy Activity Dummy Activity Dummy Activity EE 2000 Sim (11) Sensor Test Approval (28) Optical Technical Review Prep (12) IR #1 Sim (5) IR #2 Sim (5) 1 Recommendations: Assume 5 days = 1 week Fill out template in weeks Don’t forget to identify milestones! 0 0 1 00 00 00 00 00 01 01 02 02 02 2 01 00 00 00 00 1 4 Design Integration Package (14) Optical Technical Review Prep (12) Optical Technical Review (13) IR #1 Sim (5) IR #2 Sim (5) IR Technical Review Prep (6) IR Technical Review (7) Dummy Activity Dummy Activity Test Integration Package (15) Design Optical Software (20) Code Optical Software Code IR Software Sensor Test Approval (28) Duration = 6 weeks Test Optical Software (22) Test IR Software (19) Design IR Software (17) 1 3 2 2 Build Integration Package (16) Test Integration Package (15) Test IR Software (19) Test Optical Software (22) Install IR Sensor (23) Install Optical Sensor (23) Final Optical Integration Testing (25) Final IR Integration Testing (24) Sensor Test Approval (28) Duration = 6 weeks Dummy Activity Dummy Activity Perform Live Sensor Tests (29) 1 2 4 3 3 Perform Live Sensor Tests (29) Dummy Activity Duration = 0 Develop Live Demonstration Plan (30) Make Final Changes To Configurations (31) Hold Live Demonstration Review (32) Perform Live Sensor Demonstration (34) Hold Hot Wash Meeting (35) Write Final Close Out Report (36) 1 2 3 4 Hold Live Demonstration Dry Runs (33) 4
Oct 05, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here