In this group assessment, you are required to write a ~2000 word report that critically analyses the conceptual design phase of a systems engineering project. The case study can be from any...

2 answer below »

In this group assessment, you are required to write a ~2000 word report that critically analyses the conceptual design phase of a systems engineering project. The case study can be from any application area, such as public transportation (e.g. light railway), power generation (e.g. Snowy Hydro 2.0) or bridges (both large and small). However, choose your case study carefully and ensure that there is enough material available so that you can satisfy the assessment criteria. The report is to analyse the stakeholder needs that gave rise to the project, the transformation of these needs into requirements and the design alternatives that were (or could have been) considered. Note that the output of conceptual design is the systems requirements specification, which details what the system is to do andnotwhatwas ultimately built.


For those of you who are repeating the unit, the case study that you choose must be different to the one that you did previously. Also note that there is to be one submission only per group.


The assessment criteria are as follows:



  1. Introduction (5 Marks)

  2. Stakeholder needs (10 Marks)

  3. Conceptual design process (20 Marks)

  4. System requirements (5 marks)

  5. Conclusion (5 marks)

  6. Research skills (10 marks)

  7. Layout and presentation (5 Marks)


The weighting of the assignment is 30%. I expect that the report will consist of 5 sections corresponding to criteria 1-5. In terms of research skills what is being assessed is to synthesise multiple resources into a coherent and balanced story. In this regard, you will need to have multiple references, but no minimum number is specified. Harvard referencing is to be used.



Answered Same DayAug 14, 2021COIT20275Central Queensland University

Answer To: In this group assessment, you are required to write a ~2000 word report that critically analyses the...

Ishika answered on Aug 29 2021
135 Votes
Western Sydney Airport
HP
Western Sydney Airport
[Pick the date]
Table of Contents
Introduction:    3
Stakeholder's needs:    4
Stage 1 airport advancement:    5
Long term around 2063:    5
The Best Site in Sydney:    5
System Requirements:    6
Employments and development for Western Sydney:    6
Development:    6
Airplane terminal activities:    6
Sustainability:    7
Conclusion:    8
Introduction:
For modern urban communities,
an airport for Western Sydney Transport Associations is fundamental. The West Sydney Airport proposed will shape the future of Western Sydney. It will bring Western Sydney together, meet aeronautical advantages and bring numerous occupations closer to where persons live. Western Sydney is a vibrant, multicultural region and now houses almost 50% of Sydney's population, but only about 30% of its employment. Its economy is the third-largest in Australia, with an expected growth of a million more by the middle of 2030.
In order to satisfy the requirements of Western Sydney and assist in its acceleration as a thriving locale, the Australian Government is investing resources in basic car organizations. Point by point arrangements and arrangements are being made in the middle of the 2020s towards the launching of a Western Sydney airport. In the following 20 years, the interest in flying administrations in Sydney will double and continue to develop. The airport of Sydney can not alone comply with this concern. No matter whether Sydney Airport has evacuated operational containments, this cannot fulfill Sydney's long-term aviation requirements. The 2012 Joint Survey of Sydney Locale Flight Limitation discovered out that fresh administrations could not be compelled to arrive at Sydney Airport by about 2027 except when another administration had been abandoned. By 2035, the degree of further growth of normal travel authorities would be limited. Significant money would be charged for failing to meet Sydney's future flight need. By 2060, the Australian economy could have a total output of up to US$ 34 billion, while NSW alone could forego gross government items of US$ 17.5 billion.
For the suggested airport to fulfill its maximum capacity, large car connections will be necessary. Under this section of the arrangement, under the $3.6 billion Western Sydney Infrastructure Plan, the NSW government began developing new and updated roads for the proposed aircraft terminal and the occupants of West Sydney. Rail is also committed to helping both Western Sydney growth and the airport proposed. This is the reason for the cooperation between the Australian and NSW governments in the Western Sydney Rail Scoping Studies, in order to assess the requirements of travelers traveling by rail in the western Sydney area and the aircraft terminal proposed. Under the Australian Government in anticipation of a rail partnership, the airport will be prepared by guaranteeing that railway room through the site, including station boxes, will be protected.
Stakeholder's needs:
Usually, from the Board's point of vista, it is the pretense of reversing the risk of stakeholder and network kickbacks that the start of a Commonwealth subsidized foundation extends to NSW. This methodology has not always proven efficient, although it is traditionalistic in its scheme. It is not known that few such initiatives have shown that the shortcomings of usual stakeholder engagement courses have been taken from these instances. BPS sees the problems it faces in coping with the various stakeholders but also sees the opening doors to using a robust, simple engagement approach from the stakeholders.
The full evidence that all parties involved are involved is a work overview and the scope of this approach has gone well beyond. Our response is to recognize the wishes of participants and to lead management from the point of perspective of stakeholders. We disclose our engagement plan to stakeholders. When updated, the approach creates an affinity with stakeholders, leads to implementation and progress and transmits a program in line with the stakeholder estimates.
Conceptual design:
In view of traveler request, a Western Sydney Airport will be...