Prior to beginning your Network Design Proposal and Design draft, read Anthony’s Potato Chip Company Scenario Download Anthony’s Potato Chip Company Scenario to learn the background information. Then,...

Please see attachment



Prior to beginning your Network Design Proposal and Design draft, read Anthony’s Potato Chip Company Scenario Download Anthony’s Potato Chip Company Scenario to learn the background information. Then, use the Network Design Proposal and Design Download Network Design Proposal and Design template to complete the following elements. Requirements Analysis Include the requirements for each of the following: Data types Data sources Numbers of users and priority levels Transmission speed requirements Load variation estimates Storage requirements Reliability requirements – The standards reliability requires the network to operate at following percentage rates: Standard operations uptime: Downtime: Error rate: 0.001% Existing network (a description of the existing network) High-Level Diagram Different levels of design describe the network at different degrees of granularity. Create a high-level diagram of an entire network that shows only the buildings and internet using SmartDraw (Links to an external site.) or a similar network design software. There are several free options or free trials available online. Detailed Design Design the LAN Network for all of the buildings (separately) using the Headquarters First Floor Download Headquarters First Floor , Headquarters Second Floor Download Headquarters Second Floor , Escondido New Sales Office Download Escondido New Sales Office , and Alpine Manufacturing and Production Download Alpine Manufacturing and Production floor plans. Your design should also include network equipment (similar to Figure 7-1 in your text). Figure 7-1 Design the distribution layer backbone that will connect the floors for the San Diego Headquarters. Building. Add this backbone information to your LAN diagram (similar to Figures 8-1, 8-4, or 8-5 in your text). Figure 8-1 Figure 8-4 Figure 8-5 Alternatively, design a VLAN that links the buildings and departments together to establish a virtual environment. With the addition of the new Sales office in Escondido, the CIO wants to be sure that some of the load is taken off of the LAN. In addition, various departments throughout the entire organization should be able to communicate and collaborate in a virtual environment, rather than always needing to meet face-to-face. Add the VLAN-based backbone to your designs as appropriate (similar to Figures 8-6, 8-7, or 8-8 in your text). Figure 8-6 Figure 8-7 Figure 8-8 Compare the VPN based backbone with the VLAN based backbone and explain which one would be more appropriate for this project and why? Design the WAN. Copy your high-level diagram and add the WAN to the diagram by including any physical connections such as T1, T3, CO3, etc. and VPNs (similar to Figures 9-8 and 9-9) as needed. Figure 9-8 Figure 9-9 Equipment Analysis Determine the equipment needed based on your planned network and create your network's Equipment Analysis table (similar to Figures 7-21 and 8-16 in your text). Specify the products you are considering for your design and include their costs and the total cost of the network. You may use the site www.cdw.com (Links to an external site.) to find any other equipment needed. To ensure compatibility and reliability, it is recommended to have the devices from one single vendor, such as Cisco. Figure 7-21 Figure 8-16 Provide a rationale for your choices based on your sources. Recommend additional software that Anthony’s will need for ease of communication. For example: Skype, WebEx, Adobe, audio files, email, chat, and video. Provide a rationale for your recommendations using scholarly and/or credible sources. (Similar to Figure 9-20 in your text). Figure 9-20 (NOTE: There is no one single solution. The design is based on your network optimization decisions.) For your initial post via word document Write an email to the CEO of Anthony’s Potato Chip Factory addressing the need for your proposal. In your email, briefly explain the concepts of networking and data communication that relate to the work you plan to do for Anthony’s Potato Chip Company. Remember that you want the CEO to understand your ideas, even though the CEO may not be a network expert. Attach your Network Design Proposal and Design. Maintenance Complete the Maintenance column, as if you are planning to support your project for 6 months after deployment. Include items such as software updates, upgrades, troubleshooting, Operation and Maintenance (OM) Monitoring. INT301 Network Design and Design Proposal for Anthony’s Potato Chip Company Author: Eric Williams Created on: 09/01/2020 Requirement Analysis Data Types: Data will consist of multiple formats, including audio/visual, text, and proprietary information pertainant to manufacturing. This can include a variety of information such as sales/marketing, customer details, and financial information. Data Sources: Data will be primarily generated at the 3 Anthony’s locations of San Diego, Escondido, and Alpine. Data will also be sourced and shared via the internet. Numbers of Users and Priority Levels: Anthony’s currently employs 500 personnel at all levels of business function. With recent rapid growth, it can be expected that positions may be created and/or relocated in the near future. Priority should be given first to the functions of the company, such as manufacturing and operations, followed by the requests of the users. Maintenance and updating should be done either during off-hours or with minimal impact to operations. Transmission Speed Requirements: A speed of 1Gbps should be sufficient for all of the users, so all network drops should have an expectation of 1000Base-T speed. At the local backbone level, 10Gbps should allow for minimal slowdown during peak usage. VPN to ISP resources should be a further step faster, at 100Gbps. Load Variation Estimates: The main office and sales office both operate within typical business hours of Monday through Friday from 7am to 5pm with peak productivity between 9am and 3pm. Manufacturing is currently operating a single 8am to 4pm shift Monday through Friday, but should be scalable for adding weekend hours and/or a second shift from 4pm – Midnight. 1This study source was downloaded by 100000773558146 from CourseHero.com on 03-13-2022 21:05:48 GMT -05:00 https://www.coursehero.com/file/68208303/DRAFT-Week4-Interactive-EWdocx/ https://www.coursehero.com/file/68208303/DRAFT-Week4-Interactive-EWdocx/ Storage Requirements: Local storage will be maintained on all laptop and desktop machines, varying per model of the PC. Network storage will be handled via a NAS device located in the 2nd floor data center in San Diego, and will be approximately 500TB initially. NAS must be upgradeable to support business scaling. Reliability Requirements. The standards reliability requires the network to operate at following percentage rates: Standard Operations Uptime: >95% uptime will be standard, supported with redundancy via VPN Downtime: <5% downtime for performance of system maintenance, updates, security scans, etc. error rate: 0.001% existing network: previous network contractors have begun planning and work on the existing network. however, the components are mostly outdated and unable to support the planned expansion. some of the existing lans are not connected to the system-wide network. high-level diagram [insert your high-level diagram. the diagram should only show the buildings and internet.] detailed design [insert detailed designs here] 2this study source was downloaded by 100000773558146 from coursehero.com on 03-13-2022 21:05:48 gmt -05:00 https://www.coursehero.com/file/68208303/draft-week4-interactive-ewdocx/ https://www.coursehero.com/file/68208303/draft-week4-interactive-ewdocx/ equipment analysis determine the equipment needed based on your planned network and complete the equipment and analysis table. specify the products you are considering for your design and include their costs and the total cost of the network. use the site www.cdw.com to find equipment. ensure the devices are all cisco to ensure compatibility and reliability. equipment cost - lan tangible costs product model price quantity warranty maintenance total $$ hp file/print server (example) 3yrs provide a rationale for your choices based on your sources. 3this study source was downloaded by 100000773558146 from coursehero.com on 03-13-2022 21:05:48 gmt -05:00 https://www.coursehero.com/file/68208303/draft-week4-interactive-ewdocx/ https://www.coursehero.com/file/68208303/draft-week4-interactive-ewdocx/ recommend additional software that anthony’s may need for ease of communication. for example: skype, webex, adobe, audio files, email, chat, and video. provide a rationale for your recommendations using scholarly sources. (similar to figure 9-19 in your text). microsoft windows 10 pro provides many excellent features for enterprise, such as group policy enforcement, remote desktop, and long-term support from the oem. likewise, ms office 365 offers both traditional locally-hosted apps, as well as cloud/web based apps. microsoft recently added teams for conferencing and is extremely competitive compared to webex or similar conferencing apps. marketing and sales may benefit from a group license for adobe to use photoshop, premier pro, and acrobat. reflection [this section is to be completed in week 5 as part of the final assignment once you have incorporated feedback provided by your peers and/or instructor]. 4this study source was downloaded by 100000773558146 from coursehero.com on 03-13-2022 21:05:48 gmt -05:00 https://www.coursehero.com/file/68208303/draft-week4-interactive-ewdocx/ powered by tcpdf (www.tcpdf.org) https://www.coursehero.com/file/68208303/draft-week4-interactive-ewdocx/ http://www.tcpdf.org downtime="" for="" performance="" of="" system="" maintenance,="" updates,="" security="" scans,="" etc.="" error="" rate:="" 0.001%="" existing="" network:="" previous="" network="" contractors="" have="" begun="" planning="" and="" work="" on="" the="" existing="" network.="" however,="" the="" components="" are="" mostly="" outdated="" and="" unable="" to="" support="" the="" planned="" expansion.="" some="" of="" the="" existing="" lans="" are="" not="" connected="" to="" the="" system-wide="" network.="" high-level="" diagram="" [insert="" your="" high-level="" diagram.="" the="" diagram="" should="" only="" show="" the="" buildings="" and="" internet.]="" detailed="" design="" [insert="" detailed="" designs="" here]="" 2this="" study="" source="" was="" downloaded="" by="" 100000773558146="" from="" coursehero.com="" on="" 03-13-2022="" 21:05:48="" gmt="" -05:00="" https://www.coursehero.com/file/68208303/draft-week4-interactive-ewdocx/="" https://www.coursehero.com/file/68208303/draft-week4-interactive-ewdocx/="" equipment="" analysis="" determine="" the="" equipment="" needed="" based="" on="" your="" planned="" network="" and="" complete="" the="" equipment="" and="" analysis="" table.="" specify="" the="" products="" you="" are="" considering="" for="" your="" design="" and="" include="" their="" costs="" and="" the="" total="" cost="" of="" the="" network.="" use="" the="" site="" www.cdw.com="" to="" find="" equipment.="" ensure="" the="" devices="" are="" all="" cisco="" to="" ensure="" compatibility="" and="" reliability.="" equipment="" cost="" -="" lan="" tangible="" costs="" product="" model="" price="" quantity="" warranty="" maintenance="" total="" $$="" hp="" file/print="" server="" (example)="" 3yrs="" provide="" a="" rationale="" for="" your="" choices="" based="" on="" your="" sources.="" 3this="" study="" source="" was="" downloaded="" by="" 100000773558146="" from="" coursehero.com="" on="" 03-13-2022="" 21:05:48="" gmt="" -05:00="" https://www.coursehero.com/file/68208303/draft-week4-interactive-ewdocx/="" https://www.coursehero.com/file/68208303/draft-week4-interactive-ewdocx/="" recommend="" additional="" software="" that="" anthony’s="" may="" need="" for="" ease="" of="" communication.="" for="" example:="" skype,="" webex,="" adobe,="" audio="" files,="" email,="" chat,="" and="" video.="" provide="" a="" rationale="" for="" your="" recommendations="" using="" scholarly="" sources.="" (similar="" to="" figure="" 9-19="" in="" your="" text).="" microsoft="" windows="" 10="" pro="" provides="" many="" excellent="" features="" for="" enterprise,="" such="" as="" group="" policy="" enforcement,="" remote="" desktop,="" and="" long-term="" support="" from="" the="" oem.="" likewise,="" ms="" office="" 365="" offers="" both="" traditional="" locally-hosted="" apps,="" as="" well="" as="" cloud/web="" based="" apps.="" microsoft="" recently="" added="" teams="" for="" conferencing="" and="" is="" extremely="" competitive="" compared="" to="" webex="" or="" similar="" conferencing="" apps.="" marketing="" and="" sales="" may="" benefit="" from="" a="" group="" license="" for="" adobe="" to="" use="" photoshop,="" premier="" pro,="" and="" acrobat.="" reflection="" [this="" section="" is="" to="" be="" completed="" in="" week="" 5="" as="" part="" of="" the="" final="" assignment="" once="" you="" have="" incorporated="" feedback="" provided="" by="" your="" peers="" and/or="" instructor].="" 4this="" study="" source="" was="" downloaded="" by="" 100000773558146="" from="" coursehero.com="" on="" 03-13-2022="" 21:05:48="" gmt="" -05:00="" https://www.coursehero.com/file/68208303/draft-week4-interactive-ewdocx/="" powered="" by="" tcpdf="" (www.tcpdf.org)="" https://www.coursehero.com/file/68208303/draft-week4-interactive-ewdocx/="">
Mar 14, 2022
SOLUTION.PDF

Get Answer To This Question

Related Questions & Answers

More Questions »

Submit New Assignment

Copy and Paste Your Assignment Here